Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, P.O. Box 1229, Galveston, Texas 77553-1229 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2000-02956 -Enterprise Products Operating LLC - Neches River - Jefferson County, Texas

Published Nov. 3, 2020
Expiration date: 12/7/2020

Public Notice          Project Plans

PROJECT DESCRIPTION:  Following a compliance investigation initiated by the Corps, the applicant has requested the following:

a.            To retain minor variations in dock and berthing area design versus construction including:

               •             T-heads added at end of shoreline revetment (Page 16 of 21).

               •             Change in revetment configuration; flattening of revetment curvature was resolved with property acquisition (Page 18 of 21).

               •             Six protection piles were permitted abutting the dock platform; only four were constructed (Page 18 of 21).

b.            To consolidate the following permits: DA #10446, #10446(01), DA #21826, #21826(01, 02, 03, 04), LOP SWG-2000-02956, and SWG-2000-02956 that was transferred from Oiltanking Beaumont Partners to Enterprise (February 4, 2016).

c.            To construct 555 cubic yards of concrete revetment mat bank stabilization in 0.0267 acres of palustrine emergent wetlands adjacent to Barge Dock A.

d.            To perform maintenance dredging on all barge and ship docks located at the BMW Terminal for 10 years.

e.            To dispose of dredged material from all docks to DMPAs: 8, 11, 12, 13, 14, 15, 15A, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, or 27A. (Page 8 of 21).

f.            To revise the wetland mitigation plan associated with permit SWG-2000-02956 to address construction discrepancies, which include an increase of mitigation planting acres from 24.6 to 42 acres, a decrease in the number of transplants from ~119,000 to ~67,000, changes to species selection, changes in herbicide application frequency, changes to monitoring frequency, changes to success criteria due to rapid colonization of desirable species.