Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, P.O. Box 1229, Galveston, Texas 77553-1229 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2021-00042 - Renaissance Offshore - Sabine-Neches Waterway - Jefferson County, Texas

U.S. Army Corps of Engineers Galveston
Published April 29, 2021
Expiration date: 6/1/2021

Full Public Notice          Project plans

PROJECT DESCRIPTION:  The applicant is proposing to remove a segment of an 8-inch pipeline and decommission in place the remaining segment.  Specifically, the applicant proposes to excavate approximately 16,398 cubic yards of the sea floor to facilitate the removal of a segment of an 8-inch pipeline crossing the Sabine Bank Channel at Station 82+800 to the limits of the standard channel set-back.  The excavated material will be spread on both sides of the pipe trench so not to raise the sea floor elevation.  The applicant states that the remaining pipe east of the channel will be decommissioned in place.  The remaining pipe west of the channel will also be decommissioned in place.  The purpose of the proposed activity is to remove the existing pipeline segment crossing the Sabine Bank Channel to accommodate navigation improvements associated with the Sabine-Neches Waterway Improvement Project.