| Sabine-Neches Waterway Channel Improvement
Project
|
2011 Final Feasibility Report and Environmental Impact Statement
|
2009 Draft Feasibility Report and Draft
Environmental Impact
- Extension
of Public Comment Period to March 12, 2010 - Sabine-Neches Waterway
Channel Improvement Project
- Notice
of Availability, Sabine-Neches Waterway Channel Improvement Project
- Draft
Environmental Impact Statement, Sabine-Neches Waterway
- Addendum
- Draft Environmental Impact Statement Index, Sabine-Neches Waterway
- Draft
Feasibility Study, Sabine-Neches Waterway
- Notice
of Public Meeting, Sabine-Neches Waterway Proposed Channel Improvement
Project
- Transcript - Sabine-Neches
Waterway Public Meeting - Beaumont, TX - Jan 26, 2010
- Transcript - Sabine-Neches
Waterway Public Meeting - Lake Charles, LA - Jan 27, 2010
|
| |
| |
Modeling and Other Studies Completed for SNWW CIP Feasibility Study
The Galveston District, Corps of Engineers and the Sabine Neches Navigation
District are conducting a feasibility study of proposed navigation improvements
to a portion of the Sabine-Neches Waterway. Links to modeling studies and
other analyses that were performed in conjunction with this study are provided
below.
(for best performance, please right-click the links
above and choose "Save Target As..." to save the documents to
your hard drive, then open them from there)
|
| |
|
| This is an official US Government
webpage. This webpage is intended to provide information of general
interest to the public. The information contained herein is accurate
as of the date of publication. |
| |
|