NEWSROOM   WHO WE ARE   MISSIONS   HISTORY
HOME

Regulatory Branch



General Permits

GP NUMBER

DESCRIPTION KEY

AUTHORIZED WORK

EXPIRATION DATE

SWG-2007-720 Lake Livingston Structures and work authorized are limited to pile supported single-family and multi-family recreational piers including boat houses/shelters, storage buildings, lifts, hoists, personal watercraft ramps/platforms and dry hydrants. 12/31/2012
SWG-1998-02413 Directional Drilling Directional drilling of pipelines under navigable waters. 12/31/2013
SWG-2002-02904 Piers Construction of single family, multi-family, and commercial piers and appurtenances. 12/31/2016
SWG-1997-02817 Boat Slips Construction of boat slips within man-made canals. 12/31/2014
SWG-1997-02818 High Island Oil Field Construction of access roads and levees and the performance of dredging for drilling sites. 12/31/2013
SWG-2002-02392 Aerial Lines Placement of aerial lines and cables over navigable waters. 12/31/2013
SWG-1999-01926 Maintenance Dredging Maintenance dredging of previously authorized artificial shallow draft upland canals. 12/31/2016
SWG-2001-00150 Artificial Wave Barriers Construction of artificial wave barriers for the purpose of shoreline erosion protection. 12/31/2016
SWG-2002-02405 Inner Harbor Corpus Christi Ship Channel Maintenance dredging within the Inner Harbor of the Corpus Christi Ship Channel from COE Sta. 1106+32 of the Corpus Christi Ship Channel to COE Sta. 1661+50 of the Viola Turning Basin. Also includes the Rincon Channel from the Corpus Christi Ship Channel to and including Canals A and B. 12/31/2013
19942(02) Artificial Reefs Designates 1,320' x 1,320' areas for artificial reefs and the placement of structures within these sites in the Gulf of Mexico, within the High Island Area. 12/31/2015
SWG-2009-123 Harris County Flood Control District Maintenance Authorizes Harris County Flood Control District to conduct work and place dredged and/or fill materials for the purpose of routine maintenance and emergency repair of existing stormwater management facilities 12/31/2014
SWG-2010-605 Texas General Land Office Authorizes the Texas General Land Office to remove Hazardous Debris, Derelict Vessel and Derelict Structure Removal on state-owned submerged lands 12/31/2016

Oil Field Development General Permits

24152 Bays and Estuaries

Authorize applicants to install, operate, and maintain structures and equipment necessary for oil and gas drilling, production,and transportation activities, provided the attached Special Conditions are met.

12/31/2012
SWG-2002-02391 Cameron & Willacy Counties Development of petroleum exploration activities in the South Padre Island Area. 12/31/2013
SWG-2002-02393 Kenedy County Development of petroleum exploration activities in the North Padre Island Area. 12/31/2013
SWG-2002-02397 Kleberg & Nueces Development of petroleum exploration activities in the Mustang Island Area. 12/31/2013
SWG-2002-02400 Aransas, Calhoun & Matagorda Counties Development of petroleum exploration activities in the Matagorda Island Area. 12/31/2013
SWG-2002-02401 Matagorda & Brazoria Counties Development of petroleum exploration activities in the Brazos Area. 12/31/2013
SWG-2002-02406 Brazoria & Galveston Development of petroleum exploration activities in the Galveston Area. 12/31/2013
SWG-2002-02404 Chambers & Jefferson Counties Development of petroleum exploration activities in the High Island, Sabine Pass, and West Cameron Area. 12/31/2013
Updated: January 11, 2012



Technical Assistance