Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2003-00357 - Triad Frisco Partners, LLC - Sabine-Neches Canal - Jefferson County, Texas

USACE Galveston District
Published Nov. 12, 2024
Expiration date: 12/13/2024

Public Notice          Project Plans

The applicant proposes to dredge approximately 305,638 cubic yards from 13.27 acres of the Sabine-Neches Canal and remove approximately 300-linear-foot of existing bulkhead, as well as a 20-foot by 40-foot boat ramp structure, at their North Yard facility.  The applicant also proposes to construct a new ship dock including a 500-foot by 40-foot dock platform, a 150-foot by 25-foot approach way on the upstream end, a 95-foot by 25-foot approach way on the downstream end, installation of four mooring dolphins, and two 140-foot pedestrian walkways.  Additionally, an articulated concrete block revetment mattress will be installed along 300 feet of shoreline.  The applicant proposes to place the dredged material into placement areas 5, 5B, 8, or 9, or the JD Murphree Wildlife Management Area (WMA) Beneficial Use Site.  Additionally, the applicant is requesting a 10-year authorization period for maintenance dredging.