Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2007-01943 - Golden Triangle Storage, LLC - unnamed wetlands and streams - Jefferson County, Texas

USACE Galveston District
Published Jan. 27, 2026
Expiration date: 2/9/2026

Public Notice          Project Plans

The applicant proposes to permanently impact 3.219 acres of palustrine emergent wetlands (PEM), 0.031 acre of palustrine shrub-scrub wetlands (PSS), 0.057 acre of palustrine forested wetland (PFO), 0.043 acre of ephemeral stream, and 0.693 acre of intermittent stream in association with the construction of a new natural gas storage facility. In addition, the proposed project includes temporary impacts to 16.056 acres of PEM, 1.749 acres of PSS, 0.116 acre of PFO, 0.006 acre of open water, 0.208 acre of ephemeral stream, and 0.041 acre of intermittent stream. The permanently filled intermittent stream, which was originally a man-made drainage feature, will be rerouted to the southwest of the original feature as mitigation for the permanently filled feature. The proposed facility consists of temporary drilling and permanent well pad sites, gas pipelines, water, air, and electrical utilities, compressor housing, services corridors, and access roads.