Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-1997-02938 - Doug Norrell - Aransas County

Published March 19, 2013
Expiration date: 4/18/2013

Full Public Notice     Project Plans

The applicant is requesting after-the-fact authorization for the placement of riprap and earthen fill along the water’s edge for the purpose of shoreline stabilization, the dredging and placement of fill associated with the construction of a new boat ramp, and the construction of new docks.  Approximately 3,161 square feet (approximately 163 cubic yards) of riprap and approximately 3,626 square feet of earthen fill were placed below the Annual High Tide Line (AHTL) along 460 linear feet of shoreline.  The applicant also dredged and filled approximately 657 square feet (approximately 17 cubic yards of dredging and 12 cubic yards of fill) below the AHTL for the construction of a boat ramp and constructed additional bulkheads to protect the boat ramp (approximately 215 square feet and 10 cubic yards fill below the AHTL).  Lastly, the applicant also constructed 484 square feet of floating dock perpendicular to the existing shoreline in addition to approximately 3,947 square feet of fixed dock and pier structures constructed mostly parallel to the existing shoreline.