SABINE PASS TO GALVESTON BAY - PORT ARTHUR AND VICINITY SEGMENTS 2, 3, 4, 5 AND 5A - DRAFT SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT
GULF INTRACOASTAL WATER WAY – BENEFICIAL USE OF DREDGED MATERIAL - Continuing Authorities Program Section 204, Aquatic Ecosystem Restoration Aransas County, Texas
GULF INTRACOASTAL WATER WAY - BENEFICIAL USE OF DREDGED MATERIAL - Continuing Authorities Program Section 204, Aquatic Ecosystem Restoration Aransas County, Texas - FINAL
GULF INTRACOASTAL WATER WAY BUDM, TEXAS, SECTION 204, P2 Number: 455266
MAIN REPORT
GULF INTRACOASTAL WATER WAY, BENEFICIAL USE OF DREDGE MATERIAL - Continuing Authorities Program Section 204 Aquatic Ecosystem Restoration DRAFT
LOWER RIO GRANDE VALLEY WATERSHED ASSESSMENT
FINAL ENVIRONMENTAL ASSESSMENT OF THE BENEFICIAL USE OF DREDGE MATERIAL FROM CORPUS CHRISTI IMPROVEMENT PROJECT
MARY RHODES PUMP STATION SHORELINE STABILIZATION PROJECT
SABINE TO GALVESTON PORT ARTHUR AND VICINITY SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT
DRAFT REPORT FOR GALVESTON 204 - Proposed project intends to place beach quality material on West end Galveston to delay erosion by beneficially using of dredged materials from the Houston/Galveston Entrance Channel.
FINAL REPORT FOR GALVESTON 204
GIWW COASTAL RESLIENCE STUDY, TX - FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT
DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT (DIFR-EA) FOR THE HICKORY COVE MARSH BENEFICIAL USE OF DREDGE MATERIAL SECTION 1122 PILOT STUDY
MAIN REPORT: DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT - Hickory Cove Marsh (Nov. 23, 2021)
COASTAL TEXAS PROTECTION AND RESTORATION AND FEASIBILITY STUDY CHIEF'S REPORT
Signed Coastal Texas Study Chief's Report - September 16, 2021
FINAL FEASIBILITY REPORT & FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) FOR THE COASTAL TEXAS PROTECTION AND RESTORATION STUDY [Coastal Texas Study]
The final version of the Coastal Texas Study is now ready for submittal to the Chief of Engineers. Upon approval by the U.S. Army Corps of Engineers (USACE), and the U.S. Army, the Study will be forwarded to the Congressional Office of Management and Budget. The Coastal Texas Study is a six-year, $20.63 million comprehensive study led by USACE in partnership with our non-federal cost-share sponsor, the Texas General Land Office (TXGLO). The purpose of the study is to identify feasible projects that reduce risks to public health and the economy, restore critical ecosystems, and advance coastal resiliency.
The results of the engineering, economic and environmental examinations have resulted in a final recommended plan that consists of multiple coastal storm risk management and ecosystem restoration features that together form a resilient Texas coast.
The Coastal Texas Study Team is not accepting additional public comments on the study during this 30-day period, which starts Sept. 10, 2021 and ends Oct. 12, 2021.The public has been given numerous opportunities to provide inputs on the Coastal Texas Study throughout the 6-year study period. As always, USACE and GLO remain committed to hearing feedback from those within the Study Area and will continue to keep Texans apprised of the progress of the Texas Coastal Study. Should Congress authorize and appropriate funding for the Coastal Texas Project, the public will be given numerous additional opportunities to comment during the Pre-construction, Design and Engineering phase of the project.
FINAL ENVIRONMENTAL IMPACT STATEMENT
Main Report
FOR MORE INFO:
For more information about the Coastal Texas Study, visit the study website at: https://coastalstudy.texas.gov/
CONTACT US:
Public comments are not being accepted at this time for the Coastal Texas Study; however, if you have comments, you may mail or email them to the address below.
Email: CoastalTexas@usace.army.mil
Mailing Address:
Attn: Coastal Texas Study
P.O. Box 1229
Galveston, TX 77553-1229
HOUSTON SHIP CHANNEL EXPANSION CHANNEL IMPROVEMENT PROJECT (HSC ECIP) PRE-CONSTRUCTION ENGINEERING AND DESIGN (PED)
DRAFT FEASIBILITY REPORT & DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE COASTAL TEXAS PROTECTION AND RESTORATION STUDY (FALL 2020) [Coastal Texas Study 2020]
VIRTUAL PUBLIC MEETING INFORMATION: Six virtual public meetings (dates & times below) will be held online (REGISTRATION INSTRUCTIONS).
- Monday, November 16, 2020 from 11:00AM to 1:00PM and from 6:00PM to 8:00PM
- Thursday, December 3, 2020 from 11:00AM to 1:00PM and from 6:00PM to 8:00PM
- Tuesday, December 8, 2020 from 11:00AM to 1:00PM and from 6:00PM to 8:00PM
HOW TO PROVIDE COMMENTS:
You may submit comments by email address coastaltexas@usace.army.mil or by mailing to this address:
USACE, Galveston District
Attention: Mr. Jeff Pinsky
Environmental Compliance Branch Regional
Planning and Environmental Center
Post Office Box 1229
Galveston, Texas 77553-1229
Public Review Documents Below: The Public Review Period has been extended and will now run from October 30, 2020 and through January 13, 2021. All comments must be postmarked by January 13, 2021.
Coastal Texas Study 2020 Draft Feasibility Report:
COASTAL TEXAS STUDY 2020 DRAFT ENVIRONMENTAL IMPACT STATEMENT (DRAFT EIS)
Draft EIS
DIFR-EIS documents for the Coastal Texas Project (CTX)
HOUSTON SHIP CHANNEL EXPANSION CHANNEL IMPROVEMENT PROJECT FINAL INTEGRATED FEASIBILITY REPORT - ENVIRONMENTAL IMPACT STATEMENT (HSC ECIP FIFR-EIS)
- Chief's Report (Signed April 23, 2020)
- Record of Decision (Signed 30 June 2020)
- HSC ECIP FIFR-EIS (Main Report)
- Appendix A - Plan Formulation
- Appendix B - Economic Appendix
- Appendix C - Engineering Appendix and Engineering Plates
- Appendix D - Real Estate Appendix
- Appendix E - Public Coordination (4 Attachments)
- Appendix F - Agency and Tribal Coordination
- Appendix G - Environmental Supporting Document
- Appendix H - Clean Water Act Section 404(b)(1) Evaluation
- Appendix I - Coastal Zone Management Act Coordination - Consistency Determination
- Appendix J - Clean Air Act - General Conformity Determination
- Appendix K - Endangered Species Act - Biological Assessment
- Appendix L - Essential Fish Habitat Assessment
- Appendix M - Fish and Wildlife Coordination Act - Coordination Act Report
- Appendix N - National Historic Preservation Act Coordination
- Appendix O - Habitat Modeling Report and Cost Effectiveness/Incremental Cost Analysis
- Appendix P-1 - Mitigation Plan for Oyster Reef Habitat
- Appendix P-2 - Wetland Mitigation Plan
- Appendix Q - List of Preparers
- Appendix R - HSC ECIP DMMP
- Appendix S - Non-Federal Sponsor Letters
- Appendix T - NMP ERDC Final Report (June 2019)
- Text, Figures, & Tables
- Appendix 1, USACE SAP
- Appendix 2, Field Report
- Appendices 3-6, Chain of Custody, Particle Size Distribution
Report, Full Analytical Data Tables, & Analytical Lab Reports
- Appendix 7, CDFATE Model Report
- Appendices 8-9, Tier III Biological Testing Report & USEPA
R6 Validation Worksheets
CORPUS CHRISTI SHIP CHANNEL, TEXAS, LA QUINTA EXPANSION FEASIBILITY STUDY AND ENVIRONMENTAL ASSESSMENT
Notice of Public Scoping Meeting
When: Tuesday, June 4, 2019, from 6:00-8:00 PM
Where: Solomon Ortiz Center, Nueces Room, 402 Harbor Drive, Corpus Christi, Texas 78401
Presentation from Public Scoping Meeting
FORWARD PUBLIC COMMENTS Via Email to: CESWF-LaQuinta-Feasibility@usace.army.mil
U.S. Army Engineer District, Galveston
Attention: La Quinta Ship Channel Feasibility Study, CESWF-PEC-CC
P.O. Box 1229, Galveston, Texas 77553-1229
(Written comments must be postmarked by July 3, 2019)
BRAZOS RIVER , FORT BEND COUNTY, TX FLOOD RISK MANAGEMENT
GULF INTRACOASTAL WATERWAY, BRAZOS RIVER FLOOD GATES AND COLORADO RIVER LOCKS FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT (GIWW BRFG-CRL FIFR-EIS)
DRAFT CITY OF COLUMBUS (CAP, SECTION 14) - EMERGENCY STREAMBANK AND SHORELINE PROTECTION - INTEGRATED PLANNING AND DESIGN ANALYSIS AND ENVIRONMENTAL ASSESSMENT
Public Review Documents: All comments must be postmarked by January 7, 2019.
FREEPORT HARBOR CHANNEL IMPROVEMENT PROJECT, BRAZORIA COUNTY, TEXAS FINAL INTEGRATED GENERAL REEVALUATION REPORT AND ENVIRONMENTAL ASSESSMENT (Freeport FIGRR-EA)
DRAFT ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT, MATAGORDA SHIP CHANNEL PROJECT DEFICIENCY STUDY, MATAGORDA COUNTY, TEXAS.
Public Review Documents:
JEFFERSON COUNTY ECOSYSTEM RESTORATION FEASIBILITY STUDY FINAL INTEGRATED FEASIBILTIY REPORT AND ENVIRONMENTAL ASSESSMENT (JCER - FIFR-EA)
MATAGORDA SHIP CHANNEL DRAFT INTEGRATED FEASIBILITY REPORT - ENVIRONMENTAL IMPACT STATEMENT (MSC DIFR-EIS)
Final Report
Proposed Chief's Report
THE RESACAS AT BROWNSVILLE, TEXAS, ECOSYSTEM RESTORATION STUDY, FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT (RESACAS FIFR-EA)
GALVESTON HARBOR CHANNEL EXTENSION FEASIBILITY STUDY, HOUSTON-GALVESTON NAVIGATION CHANNELS, TEXAS
HOUSTON SHIP CHANNEL PROJECT DEFICENCY REPORT (FLARE AT THE INTERSECTION OF THE HOUSTON SHIP CHANNEL AND BAYPORT SHIP CHANNEL), HOUSTON-GALVESTON NAVIGATION CHANNELS, TEXAS, FINAL REPORT AND ENVIRONMENTAL ASSESSMENT
SABINE PASS TO GALVESTON BAY, TEXAS, COASTAL STORM RISK MANAGEMENT AND ECOSYSTEM RESTORATION FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT (S2G FIFR-EIS)
- Final EIS Notice of Availability (26 May 2017)
- S2G FIFR-EIS Main Report and EIS
- Appendix A - Measure Information Sheet, Part 1
- Appendix A - Measure Information Sheet, Part 2
- Appendix B - Plan Formulation
- Appendix C - Economic Appendix
- Appendix D - Engineer Appendix Attachment Part A
- Appendix D - Engineer Appendix Attachment, Part B
- Appendix D - Engineer Appendix Attachment, Part C
- Appendix D - Engineer Appendix Attachment, Part D
- Appendix D - Engineer Appendix Attachment, Part E
- Appendix E - Real Estate Plan, Part 1
- Appendix E - Real Estate Plan, Part 2
- Appendix E - Real Estate Plan, Part 3
- Appendix F - Public Coordination
- Appendix G, Agency and Tribal Coordination, Part 1
- Appendix G, Agency and Tribal Coordination, Part 2
- Appendix H - Clean Water Action Section 404(b)(1) Evaluation
- Appendix I - Clean Air Act Emissions Modeling
- Appendix J - Endangered Species Act - Biological Assessment
- Appendix K - Fish and Wildlife Coordination Act – Final Coordination Action Report
- Appendix L - National Historic Preservation Act Coordination – Programmatic Agreement
- Appendix M - Coastal Zone Management Act Coordination – Consistency Determination
- Appendix N - Hazardous, Toxic and Radioactive Waste Assessment
- Appendix O - Wetlands Value Assessment Ecological Modeling Report
- Appendix P - Monitoring and Adaptive Management Plan
- Appendix Q - Wetlands Value Assessment Coastal Marsh Model Sensitivity Analysis
- Appendix R - Demographic Analysis Appendix
- Appendix S - List of Preparers
- Appendix T - Distribution List
CEDAR BAYOU, TEXAS, DREDGED MATERIAL MANAGEMENT PLAN AND ENVIRONMENTAL ASSESSMENT (DRAFT CB DMMP/EA)
HUNTING BAYOU DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT (HUNTING BAYOU DRAFT GRR/EA)
BRAZOS ISLAND HARBOR CHANNEL IMPROVEMENT PROJECT - DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT, DEC 2013
GULF INTRACOASTAL WATERWAY - VICINITY OF PORT O'CONNOR, TEXAS, CHANNEL EVALUATION
BAYPORT SHIP CHANNEL IMPROVEMENTS SECTION 408 ANALYSIS AND 204(f) ASSUMPTION OF MAINTENANCE
Additionally, we have made the final Environmental Impact Statement for the PHA's 2004 Bayport ship Channel Container/Cruise Terminal project available for download through the following links:
FEIS (331 MB):
http://go.shoalest.com/BPT_FEIS_Main
http://go.shoalest.com/BPT_FEIS_Backup
The Final Environmental Impact Statement (FEIS) may also be requested on disk due to large file size. Please contact the Port of Houston by e-mail at deepeningportofhouston@poha.com.
ADDICKS AND BARKER DAM SAFETY PROJECT
ALLIGATOR BAYOU ASSESSMENT FOR SECTION 408
CORPUS CHRISTI SHIP CHANNEL ASSUMPTION OF MAINTENANCE
FREEPORT HARBOR CHANNEL IMPROVEMENT PROJECT
JACINTOPORT ASSUMPTION OF MAINTENANCE
RESACA BOULEVARD REASACA ECOSYSTEM RESTORATION, CAMERON COUNTY, BROWNSVILLE, TEXAS (CAP, SECTION 206)