Galveston District Header Image

GALVESTON DISTRICT

Home
Home > Business With Us > Planning & Environmental Branch > Documents for Public Review

Planning and Environmental Documents for Public Review

MATAGORDA SHIP CHANNEL DRAFT INTEGRATED FEASIBILITY REPORT - ENVIRONMENTAL IMPACT STATEMENT (MSC DIFR-EIS)

Public Information Meeting:
When: 
Tuesday, May 15, 2018, from 6:00-8:00 PM
Where:  Bauer Exhibit Building, 186 Henry Barber Way, County Road 101, Port Lavaca, TX 77979

FORWARD PUBLIC COMMENTS TO:  harmon.n.brown@usace.army.mil 
(Public Comments are accepted from May 7, 2018 thru June 21, 2018) 

Public Review Documents:

BRAZOS RIVER FLOOD GATES-COLORADO RIVER LOCKS FEASIBILITY STUDY

Public Information Meeting:
When: 
Tuesday, March 13, 2018, from 6:00-8:00 PM
Where: 
West Columbia Civic Center, 516 E. Brazos Ave. (State Highway 35) West Columbia, TX 77486

FORWARD PUBLIC COMMENTS TO:  BRFG_CRL_FeasibilityStudy@usace.army.mil 

(Public Comments are accepted from Feb. 26, 2018 thru Apr. 11, 2018)

Public Review Documents

HOUSTON SHIP CHANNEL EXPANSION CHANNEL IMPROVEMENT PROJECT DRAFT INTEGRATED FEASIBILITY REPORT - ENVIRONMENTAL IMPACT STATEMENT (HSC ECIP DIFR-EIS)

Because much of the interested public has been affected or displaced by Hurricane Harvey, the public comment period has been extended an additional 30 days.  Additionally, the following public information meetings to be held in the Houston area during the public comment period will now occur in October:

First Public Information Meeting:
When: 
Thursday, October 19, 2017, from 6:30-8:30 PM
Where:  La Porte Junior High, 401 S Broadway St, La Porte, TX 77571

Second Public Information Meeting:
When: 
Wednesday, October 25, 2017 from 6:30-8:30 PM
Where:  Galena Park High School, 1000 Keene St, Galena Park, TX 77547

Public Review Documents (Comments must be postmarked by November 13, 2017)

MATAGORDA SHIP CHANNEL, UPPER REACH PLACEMENT AREA RELOCATION PROJECT, CALHOUN COUNTY, TEXAS

THE RESACAS AT BROWNSVILLE, TEXAS, ECOSYSTEM RESTORATION STUDY, FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT (RESACAS FIFR-EA)

FREEPORT HARBOR CHANNEL IMPROVEMENT PROJECT, BRAZORIA COUNTY, TEXAS DRAFT INTEGRATED GENERAL REEVALUATION REPORT AND ENVIRONMENTAL ASSESSMENT

GALVESTON HARBOR CHANNEL EXTENSION FEASIBILITY STUDY, HOUSTON-GALVESTON NAVIGATION CHANNELS, TEXAS

  • APPENDIX A - Economic Analysis
  • APPENDIX B - Engineer Appendix 
  • APPENDIX C - Total Project Cost Summary   
  • APPENDIX D - Real Estate Appendix
  • Environmental Assessment
  • Feasibility Study
  •  

    HOUSTON SHIP CHANNEL 45-FOOT EXPANSION CHANNEL IMPROVEMENT PROJECT (HSC ECIP), HARRIS AND GALVESTON COUNTIES, TEXAS

    • Notice of Public Scoping Meetings (17 May 2016 and 19 May 2016)

    HOUSTON SHIP CHANNEL PROJECT DEFICENCY REPORT (FLARE AT THE INTERSECTION OF THE HOUSTON SHIP CHANNEL AND BAYPORT SHIP CHANNEL), HOUSTON-GALVESTON NAVIGATION CHANNELS, TEXAS, FINAL REPORT AND ENVIRONMENTAL ASSESSMENT   

    SABINE PASS TO GALVESTON BAY, TEXAS, COASTAL STORM RISK MANAGEMENT AND ECOSYSTEM RESTORATION FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT (S2G FIFR-EIS)       

     CEDAR BAYOU, TEXAS, DREDGED MATERIAL MANAGEMENT PLAN AND ENVIRONMENTAL ASSESSMENT (DRAFT CB DMMP/EA)

    HUNTING BAYOU DRAFT GENERAL REEVALUATION REPORT AND INTEGRATED ENVIRONMENTAL ASSESSMENT (HUNTING BAYOU DRAFT GRR/EA)

    BRAZOS ISLAND HARBOR CHANNEL IMPROVEMENT PROJECT - DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT, DEC 2013

    GULF INTRACOASTAL WATERWAY - VICINITY OF PORT O'CONNOR, TEXAS, CHANNEL EVALUATION

    BAYPORT SHIP CHANNEL IMPROVEMENTS SECTION 408 ANALYSIS AND 204(f) ASSUMPTION OF MAINTENANCE

    Additionally, we have made the final Environmental Impact Statement for the PHA's 2004 Bayport ship Channel Container/Cruise Terminal project available for download through the following links:

    FEIS (331 MB):

    http://go.shoalest.com/BPT_FEIS_Main

    http://go.shoalest.com/BPT_FEIS_Backup

    The Final Environmental Impact Statement (FEIS) may also be requested on disk due to large file size. Please contact the Port of Houston by e-mail at deepeningportofhouston@poha.com.

    GALVESTON HARBOR CHANNEL EXTENSION

    ADDICKS AND BARKER DAM SAFETY PROJECT

    ALLIGATOR BAYOU ASSESSMENT FOR SECTION 408

    CORPUS CHRISTI SHIP CHANNEL ASSUMPTION OF MAINTENANCE

    FREEPORT HARBOR CHANNEL IMPROVEMENT PROJECT

    JACINTOPORT ASSUMPTION OF MAINTENANCE

    RESACA BOULEVARD REASACA ECOSYSTEM RESTORATION, CAMERON COUNTY, BROWNSVILLE, TEXAS (CAP, SECTION 206)

    Galveston District Planning Section
    Mailing Address:
    USACE Galveston District
    P.O. Box 1229
    Galveston, TX 77553-1229

    Email: SWG-P&E@usace.army.mil 
    Phone: 409-766-3029
    Fax: 409-766-3064
    Galveston District Environmental Section
    Mailing Address:
    USACE Galveston District
    P.O. Box 1229
    Galveston, TX 77553-1229

    Email: SWG-P&E@usace.army.mil 
    Phone: 409-766-3044

    Archived Public Notices