USACE survey teams make a detailed map of the sea floor before a dredge operation to estimate the amount of material to be removed and after the dredge has completed work on the section to calculate and verify that the contract work was completed. If the dredge material is deposited offshore a survey team will make a third map of the sand added to the ocean floor.