Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2014-00181 - Cameron Parish Gravity Drainage District No. 7

Published April 15, 2014
Expiration date: 5/15/2014

Full Public Notice    Project Plans

The applicant proposes to construct a salinity control structure in Johnsons Bayou.  The structure would consist of nine flap gate barrels and two screw gate barrel for emergency closures.  The screw gates would include open fish access bays.  The applicant is proposing to discharge approximately 1,680 cubic yards of select fill material in Johnsons Bayou to stabilize the structure.  The proposed work would impact 0.062 acre of Johnsons Bayou.  Approximately 30 cubic yards of aggregate material would be placed on top of the structure to create a road crossing, and 30 cubic yards of 55-pound-class riprap will be placed around the structure to prevent erosion.  The applicant is proposing to construct a wire panel boat barrier approximately 20 feet downstream from the proposed salinity control structure.  Target salinity levels would be consistent with an intermediate marsh management regime.