Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2016-00699 - Harris County Toll Road Authority - wetlands - Harris County, Texas

Published Dec. 5, 2017
Expiration date: 1/8/2018

Full Public Notice          Project Plans

PROJECT DESCRIPTION:  The applicant proposes to discharge 186,274 cubic yards of fill material into 5.10 acres of jurisdictional waters of the United States (U.S.), during excavation and fill activities associated with creating detention basins. 

 The proposed project activities are associated with the widening of the Sam Houston Tollway (East) from IH-45 South to SH-225.  Such activities include the construction of detention basins occurring within the boundaries of eight separate subject properties, totaling 30.76 combined acres in size.  Refer to the table 1 below for more information.

Table 1.

No.         Waters

                Name    Name    Latitude               Longitude            Impacts (Acres)

1              Area A  PSS         29.7025247          -95.151805          4.88

2              Area C   PEM       29.6787926          -95.15335             0.04

3              Area D  PEM       29.6285618          -95.169396          0.03

4              Area E   PUB       29.6123125          -95.20027             0.01

5              Area G  PEM       29.7011804          -95.152777          0.00

6              Area I    PEM       29.7021059          -95.150231          0.00

7              Area J    PEM       29.6896664          -95.151579          0.02

8              Area K   PEM       29.6782908          -95.154099          0.00

9              Area L   PEM       29.6781739          -95.154108          0.00

10           Area M PEM       29.62904              -95.169811          0.10

 

Total Wetland Impacts   5.08

 

No.         Waters Name                                                                    Name                    Latitude               Longitude            Impacts (Acres)

1              Area B (HCFCD Drainage Unit No. G105 03 00)     Intermittent       29.6891807          -95.1513413        0

2              Area H (HCFCD Drainage Unit No. G105-01-00)   Intermittent       29.70067              -95.1528755        0