Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2019-00302 - Marathon Petroleum - Texas City Ship Canal in West Bay - Galveston County, Texas

Published Aug. 20, 2019
Expiration date: 9/20/2019

Public Notice           Project Plans

PROJECT DESCRIPTION:  The applicant proposes to discharge 13,000 cubic yards into 0.95 acres of West Bay to facilitate the construction of a 1,500-foot steel sheet pile bulkhead with backfill, 95 linear feet of sheet pile wall, 2 piles and a new emergency boat dock area.  The area between the existing shoreline and the proposed bulkhead will be filled throughout with 0.95 acres of fill.  The proposed project activity consists of the installation of the 1,500 feet of new steel sheet pile bulkhead, north and south of dock 32/34, with another 165 feet near the proposed emergency boat dock area.  The applicant also proposes to remove an existing 1,260-square-foot wooden boat house and replace it with the proposed emergency boat dock area.