Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2019-00189 - Prestige Oysters - Gulf Intracoastal Waterway - Matagorda County, Texas

Published Jan. 14, 2020
Expiration date: 2/14/2020

Full Public Notice           Project Plans

PROJECT DESCRIPTION:  The applicant proposes to develop a commercial dock facility by excavating a marina in uplands bordered by the construction of a bulkhead and a 25-foot-wide concrete work area around the perimeter of the marina.  The marina will be excavated to -10 feet Mean High Tide (MHT).  An entrance channel connecting the marina to the GIWW will be excavated to the equivalent depth in the GIWW.  All improvements will be placed above the MHT line on the site except for the entrance channel.  No structures or fill will be placed in the GIWW and only excavation of the entrance channel will extend below the MHT line into the GIWW.  Approximately 375 cubic yards of material will be removed below the MHT.  All dredged material will be placed on site.