Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2020-00273 - Texas Department of Transportation (TxDOT)-Houston District - Buffalo Camp Bayou - Brazoria County, Texas

Published Nov. 5, 2020
Expiration date: 12/7/2020

Public Notice          Project Plans

PROJECT DESCRIPTION:  The applicant proposes to discharge a 4.379 acres of fill material into wetlands, and 314 linear feet of fill material into waters of the U.S. during the roadway improvements associated with the reconstruction and widening of SH 332.  Specifically, the following impacts are proposed:

SH 332 would be reconstructed and widened from two to four lanes (two lanes in each direction) from FM 521 to FM 2004.  The proposed project would also reconstruct and widen SH 332 from four to six lanes (three lanes in each direction) from FM 2004 to SH 288.  Roadway improvements would include the replacement of bridges over Buffalo Camp Bayou and a diversion channel just east of Buffalo Camp Bayou.  The project would include sidewalks on both sides of the roadway for the entire length of the project.  In addition to roadway improvements, improved drainage ditches would be constructed along the north and south sides of the project.  Additionally, a new drainage channel is proposed on new location from SH 332, approximately 800 feet west of Division Street (County Road (CR) 680A), south to the Brazos River, a distance of approximately 1.1 miles.