Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, P.O. Box 1229, Galveston, Texas 77553-1229 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2015-00690 - City of League City - Clear Creek and adjacent waters, including wetlands - Galveston and Harris Counties, Texas

U.S. Army Corps of Engineers Galveston
Published Oct. 19, 2021
Expiration date: 11/19/2021

Full Public Notice          Project Plans         Mitigation Plans

PROJECT DESCRIPTION:  The applicant proposes to permanently impact, through the discharge of 1,728 cubic yards of fill material, approximately 0.325 acre of estuarine emergent wetlands, 0.607 acre of palustrine emergent wetlands, 0.793 acre of palustrine forested wetlands, and 0.088 acre of other waters of the U.S. during roadway construction activities associated with the 1.7-mile extension of Landing Boulevard.  The proposed roadway will extend Landing Boulevard from just north of FM 518 (West Main Street), in League City, Galveston County, to a proposed roundabout with the proposed NASA Road 1 Bypass extension, which will connect to the existing NASA Road 1 Bypass at Interstate Highway 45, in Webster, Harris County, Texas.  The proposed roadway extension includes a bridge over Clear Creek with a length of 2,772 feet from approach-to-approach.  The bridge structure requires authorization by the US Coast Guard; the Corps will evaluate the discharges of fill material associated with the construction of the bridge approaches.  The proposed roadway and bridge will consist of two, 12-foot lanes in each direction; one, 10-foot shared use path to the west; and one, 5-foot sidewalk to the east.  Approximately 1.812 acres of wetlands and waters will be temporarily impacted during construction activities associated with the proposed roadway expansion.