Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, P.O. Box 1229, Galveston, Texas 77553-1229 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-1994-02067 - West Gulf Marine, Inc. - Galveston Bay - Galveston County, Texas

U.S. Army Corps of Engineers Galveston
Published April 5, 2022
Expiration date: 5/5/2022

Full Public Notice          Project Plans

PROJECT DESCRIPTION:  The applicant is requesting that their expired permit be modified to extend the time for construction to complete previously authorized work.  The applicant proposes to construct approximately 560 linear feet of new bulkhead, 175 linear feet will be located below the mean high tide line, requiring 171 cubic yards of clean fill material into 0.094 acre of waters of the United States; relocate 2 existing mooring structures and existing rip-rap; to install a 12-inch concrete slab; and to hydraulically dredge approximately 100,000 cubic yards of sandy non‐vegetated material within 6 acres located adjacent to West Gulf Marine’s existing shipyard facilities to a depth of -18 mean low tide.  The applicant is also requesting authorization to perform future maintenance dredging within both the modified and previously authorized dredge footprint.