Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, P.O. Box 1229, Galveston, Texas 77553-1229 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2009-00831 - COUNTY OF NUECES - Gulf of Mexico - Nueces County, Texas

USACE Galveston District
Published April 6, 2023
Expiration date: 4/21/2023

Public Notice          Project Plans

The applicant proposes to construct a new public pier in the general footprint of a previously permitted one damaged by Hurricane Harvey and recently removed.  The previously permitted pier was demolished and removed under the conditions of its construction permit (No. 14690) in 2022.  The pier would extend a total of 1,101 feet from the Mean High Water (MHW) line out into the Gulf of Mexico.  The total overwater square footage of the project would be 45,260-square-foot consisting of:  a 90-foot-long by 25-foot-wide deck for a bait shop, public bathrooms and access control on the south side of the pier close to the land; a 1,030.7-foot-long (from MHW) by 20-foot-wide walkway, and a 70.5-foot-long diamond-shaped terminal platform that would extend 69.5 feet on each side of the 20-foot walkway area (159 feet at its widest).  The proposed pier structure would be constructed of driven concrete piles at the landside concession and public area and steel pipe piling for the stem and diamond head with the total number consisting of 44 (24-inch-square), 62 (24-inch-square), and 22 (48-inch-square) piles.  Construction cranes and material would arrive and be supported on barges.  A temporary trestle may be constructed with driven steel piles and a temporary deck adjacent to the new pier for construction of the new pier and demolished prior to completion of the project.  No dredging or fill is involved.  There are no seagrasses or wetlands at the project location.  The purpose of the project is to provide public accessibility and recreational opportunities to the general public.