Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2011-00162 - Port of Galveston - Galveston Bay/Harbor - Galveston County, Texas

USACE Galveston District
Published June 22, 2023
Expiration date: 7/24/2023

Public Notice          Project Plans

The applicant is requesting to modify and expand existing structures and is not seeking an extension of time for permitted work set to expire 31 December 2026.  The proposed work includes the following:

Pier 22:

  • Installation of a new 28-foot mooring dolphin platform
  • Installation of one, 200 metric ton (MT) bollard
  • Installation of four, 48-inch-diameter typical (TYP) steel pipe piles

Repair and Replacement of Existing Structures at Piers 23-25:

  • Remove 10 existing bollards
  • Installation of four, 150 MT bollards
  • Installation of two, 100 MT bollards
  • Installation of new decking to bring back-set areas approximately 20’ 7” x 10’ and 12’ 9” x 96’ 11” in line with the existing pier face
  • Installation of twenty-nine, 36-inch-diameter steel pipe piles (TYP)
  • Installation of ten, 24-inch-diameter steel pipe piles (TYP)
  • Installation of 3 new fenders
  • Removal of approximately 224’ x 50.5’ of existing decking and installation of new decking
  • Below deck removal
    • Cut existing pile (approximately 100)