Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2003-02165 - TEXAS DEPARTMENT OF TRANSPORTATION - Corpus Christi Ship Channel - Nueces County, Texas

USACE Galveston District
Published Sept. 5, 2023
Expiration date: 10/5/2023

Public Notice          Project Plans

The applicant proposes to repair and upgrade the existing ferry facility which would include work on bulkheads, breakwaters, mooring dolphins, and ferry slips.  Approximately 1,016 linear feet (LF) of steel sheet pile bulkhead would be placed approximately 1.5 feet in front of the existing bulkhead.  The bulkheads would include A-frame anchor walls that have concrete piles driven on land.  The existing breakwater on Mustang Island would be extended approximately 107 feet and would consist of steel sheet pile combined with steel pipe.  The existing breakwater on Harbor Island would be extended by constructing the bulkhead approximately 40 feet away from the existing bulkhead, resulting in the permanent loss of 0.3 acre of Section 10 waters.  At the base of the new bulkhead and breakwaters, approximately 1.46 acres of 15-inch and 18-inch stone riprap would be placed.  At the Mustang Island landing, approximately 2,500 cubic yards of material would be dredged at slips 11 and 6.  The dredge material will be placed in an upland location outside of the Texas Department of Transportation (TxDOT) right-of-way (ROW).  At the Harbor Island landing, the 27 existing mooring dolphins would be replaced with 24 monopile mooring dolphins.  At the Mustang Island landing, the 36 existing cluster pile dolphins would be replaced with 40 monopile mooring dolphins.  New monopile dolphins would be a combination of 36-, 40-, and 60-inch-diameter monopiles.