Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2015-00267 - Mr. Jesse Hunt - Calhoun County

Published June 4, 2015
Expiration date: 7/6/2015

Full Public Notice    Project Plans

The applicant proposes to install approximately 100 linear feet of bulkheading and backfill the bulkhead with dredged material.  Approximately 635 cubic yards of GIWW bottom will be mechanically dredged to a depth of -5 feet below mean high water.  Material not placed behind the bulkhead will be placed upon the adjacent property to raise the elevation.  Additionally, the applicant proposes to install 50 9-inch-diameter wooden pilings for pier support.  The applicant proposes a wrap-around C-shaped marina basin with a wrap-around, 4-foot-wide by 252-foot-long pier.  Five         12-foot-long by 4-foot-wide finger piers will be constructed adjacent to the area of the pier abutting the shoreline.  The finger piers will have two pilings spaced midway between them to create a double slip.  The piers will not extend into the GIWW beyond the existing boathouse.