Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, P.O. Box 1229, Galveston, Texas 77553-1229 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2008-00652 - Greehey and Company, Ltd. - Aransas County

Published Jan. 28, 2014
Expiration date: 2/28/2014

Full Public Notice    Project Plans    Mitigation Plan

 

The applicant proposes to create a mixed-use marina development with direct access to the Gulf Intracoastal Waterway (GIWW) on a 46.72- acre tract, which will include a marina, hotel, condominiums, retail space and single-family residential development.  The applicant states that the proposed marina design will include a canal system which will allow for water circulation by expanding the existing connection to the GIWW to take advantage of the predominant southeasterly breeze and allow water to move into and out of the canal.  The proposed canal will have a uniform depth of -8.00 ft MSL and will vary in width from 100 feet at its narrowest point to 550 feet at its widest point.  Approximately 56,551 cubic yards of material are proposed to be mechanically excavated from jurisdictional areas and 183,585 cubic yards of material from uplands during the creation of the proposed marina and canal.  Additionally, the applicant proposes to construct approximately 4,430 linear feet of bulkhead within the proposed canal.