ORANGEFIELD ELEMENTARY SCHOOL RECEIVES PORTABLE BUILDINGS
The Port Arthur Field Office of the Galveston District USACE provided oversight for the construction of the project. A total of eight 700 sq. ft. classrooms, a 600 sq. ft. office, temporary restrooms and a 3000 sq. ft. multipurpose High School building along with covered walkways were constructed.

Download Image: Full Size (0.06 MB)
Photo by: USACE |  VIRIN: 180720-A-CE999-0761.JPG

Photo Albums

Visit our Flickr site for more photos.