Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, P.O. Box 1229, Galveston, Texas 77553-1229 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2011-01232 - GT Logistics - upriver of the intersection of the Port Arthur Canal and the Gulf Intracoastal Waterway - Jefferson County, Texas

Published Oct. 23, 2018
Expiration date: 11/26/2018

Full Public Notice          Project Plans

PROJECT DESCRIPTION:  The applicant proposes to modify the previously-permitted Dock 2 area.  The new dock would consist of a new 90-foot-long by 50-foot-wide loading platform.  A new 15-foot-square gangway platform, a new dockhouse platform, 6 monopile breasting dolphins, 4 new barge monopile dolphins, 300 linear feet of sheet pile bulkheading, and a shoreline revetment mattress.  The applicant also proposes to dredge 470,000 cubic yards to a depth of -42 feet (MLT).  Dredged material would be placed in Placement Areas (DMPAs) number 8, 9A, 9B, and/or 11.