Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2019-00397 - Union Pacific Railroad - wetlands and streams adjacent to Cedar Bayou - Harris and Liberty Counties, Texas

Published July 2, 2019
Expiration date: 8/2/2019

Full Public Notice          Project Plans           Mitigation Plans and HGM Worksheets          Tier II Checklist          Alternatives Analysis

PROJECT DESCRIPTION:  The applicant proposes to discharge 36 cubic yards of rock and 9,079 cubic yards of soil into wetlands and streams adjacent to Caney Creek, resulting in a total of 5.66 acres of permanent impacts to wetlands and waters of the United States and 1.58 of temporary impacts wetlands and waters of the United States.  The proposed project will include constructing approximately 9 miles of second mainline track on the northwest side of the existing mainline track.  With the proposed project, the applicant is requesting to construct bridges, culverts, associated structures and supporting infrastructure, such as access roads and drainage ditches.  The proposed project will include modifications to existing structures and the construction of new structures, currently anticipated to include:

•             Proposed bridge for the second main track and a replacement of the existing bridge structure for the existing mainline track at milepost (MP) 337.78 consisting of two new Pre-stressed Concrete Slab (PCS) span bridges with timber ties for a total length of 75 feet.

•             Proposed bridge for the second main track and a replacement of the existing bridge structure for the existing mainline track at MP 337.58 consisting of two new PCS span bridges with timber ties for a total length of about 40 feet.

•             Proposed bridge for the second main track and a replacement of the existing bridge structure for the existing mainline track at MP 335.77 consisting of two new PCS span bridges with timber ties for a total length of 58 feet.

•             Proposed bridge for the second main track adjacent to the existing bridge structure for the existing mainline track at MP 334.66 consisting of a new Pre-stressed Concrete Box (PCB) span bridge with timber ties for a total length of 282 feet.

•             Proposed bridge for the second main track adjacent to the existing bridge structure for the existing mainline track at MP 333.00 consisting of a new PCB span bridge with timber ties for a total length of 36 feet.

•             Installation of one 36-inch-diameter and 22-foot-long Corrugated Metal Pipe (CMP) culvert extension at about MP 332.46 to convey drainage from the proposed ditch under the proposed second main track.

•             Proposed bridge for the second main track and a replacement of the existing bridge structure for the existing mainline track at MP 332.04 consisting of two new PCS span bridges with timber ties for a total length of 60 feet.

•             Installation of two 36-inch-diameter by 68-foot-long Smooth Steel Pipe (SSP) culverts at MP 331.56 to convey drainage from the proposed ditch under the proposed second main track.

•             Proposed bridge for the second main track adjacent to the existing bridge structure for the existing mainline track at MP 331.15 consisting of a new PCB span bridge with timber ties for a total length of 72 feet.

•             Proposed bridge for the second main track and a replacement of the existing bridge structure for the existing mainline track at MP 330.79 consisting of two new PCS span bridges with timber ties for a total length of 58 feet.

•             Installation of one 36-inch-diameter by 78-foot-long SSP culvert at MP 329.83 to convey drainage from the proposed ditch under the proposed second main track.

•             Installation of one 4.2-foot by 2.5-foot and 30-foot-long CMP arch culvert extension at MP 329.33 to convey drainage from the ditch under the proposed access road.

The applicant also proposes to install temporary erosion control measures during construction activities.  Once the construction is completed the applicant states that all temporary erosion control measures will be removed, disturbed areas will be seeded and stabilized.  The purpose of the proposed project is to provide a second mainline track next to the existing mainline track to create a bypass for through trains to move around local trains switching customers and expand train movement capacity within this corridor.  The applicant’s plans are enclosed in 36 sheets.