Planning and Environmental Documents for Public Review

Click here to view USACE Galveston District Planning and Environmental documents for public review.

Viewing & Comments

Viewing Notices: To view a full public notice or its associated drawings file (if any), click on either full public notice or permit drawings link in the attachments section. To download the file to your computer, right-click on the public notice or drawings link, then select "Save Target As" from the menu.

How to Send Comments on Regulatory Division Public Notices: Send comments to the Regulatory Division, U.S. Army Corps of Engineers, Galveston District, 2000 Fort Point Road, Galveston, Texas 77550 or by electronic mail to our Public Notice Comment Email. Comments made in reference to a public notice should include your name, address, phone number and the Department of the Army permit number referenced in the public notice (e.g. SWG-2015-00001).  

How to Send Comment on Other Galveston District Public Notices: Please follow the instructions included with the public notice. For Galveston District Planning and Environmental Documents for public review, please click here.

SWG-2004-00003 - CITY OF ARANSAS PASS - Conn Brown Harbor - Aransas County, Texas

USACE Galveston District
Published Sept. 7, 2023
Expiration date: 10/10/2023

Public Notice          Project Plans

The applicant proposes to construct the docking capacity within the existing harbor consistent with the original authorization, creating the same 432 boat slips, but dependent upon vessel size is expected to accommodate up to approximately 544 boat vessels on approximately 103,255 square feet of floating and/or piling‐supported docks extending from the western harbor bulkhead and an additional approximately 27,902 square feet of piling support docks extending from the eastern harbor bulkhead.  Piles would be placed by either jetting, vibratory, or pile-driving methods.  No dredge activities, bulkhead construction/repair, or terrestrial development is proposed as part of this project.  Construction of dock facilities would occur throughout the duration of the permit authorization (five years).  No mitigation is proposed.  The stated purpose and need of the project is to enhance use of the existing Conn Brown Harbor by satisfying the public need for additional pleasure craft facilities and services, to help improve the marina facilities, as well as to maintain and improve use by commercial shrimping and fishing operations.