SWG awards final contract for Corpus Christi Ship Channel Improvement Project

U.S. Army Corps of Engineers, Galveston District
Published Sept. 25, 2023

The U.S. Army Corps of Engineers (USACE) Galveston District (SWG) awarded the fourth and final multimillion dollar contract for the Corpus Christi Ship Channel Improvement Project (CCSCIP) September 25, 2023.

Callan Marine will receive approximately $102.9 million to complete dredging on the final stretch of the project—the Inner Harbor reach. With the final contract the entire project will beneficially use roughly five million cubic yards of dredged material.

“Through extensive resource agency coordination, cooperation with our non-federal sponsor—the Port of Corpus Christi—a close relationship with the Texas General Land Office and a tremendous partnership with the Coastal Bend Bays and Estuaries program, about five million cubic yards of dredged material will be turned into almost 1,000 acres of something useful while leaving capacity in upland placement areas for routine maintenance dredging disposal,” said Lisa Finn, SWG’s environmental program manager for operations.  

The overall channel improvement project would combat erosion within the channel by providing 395 acres of sacrificial erosion protection along with the construction of a 2,000-foot breakwater—to tie into a currently planned 4,000-foot breakwater—in the Nueces Delta. The Nueces Delta is currently eroding at a staggering rate of about 8.2 feet per year, Finn said.

The project also aims to nourish degraded habitats by converting 206 acres of open water in an estuarine marsh. An additional 120 acres of intertidal living shoreline will be created to provide shoreline protection and prevent road overtopping, Finn said.

The CCSCIP will also create another 200 acres of an industrial use site for local economic and commercial entities.

“With this project, the Galveston District makes great strides toward the Chief of Engineers’ vision to increase beneficial use of dredged material,” said Col. Rhett Blackmon, SWG’s district commander.

“This is one of the largest beneficial use projects the district has ever constructed,” said Chris Frabotta, SWG’s operations chief. “That much dredged material would fill up the Astrodome more than three times.”

The project will improve approximately 11.9 miles of the associated shipping channel, effectively widening the channel from 400 feet to 530 feet and deepening it from 47 feet to 54 feet.

SWG contributes to the wellbeing and economic success of local communities through its beneficial use of dredged material. Annually, the Galveston District dredges approximately 30 to 40 million cubic yards of material. USACE employs environmentally and economically responsible ways to utilize dredged materials for beneficial applications  and improve eroded coastlines through beach nourishment and beneficial use programs. For more information on SWG’s beneficial use of dredged materials, visit: https://usace-galveston-district-beneficial-use-ceswg.hub.arcgis.com/.

For more news and information, follow us on Facebook, www.facebook.com/GalvestonDistrict, and Twitter,  www.twitter.com/USACEgalveston.


Contact
Carlos Gomez
(409) 766-3004
carlos.m.gomez@usace.army.mil
2000 Fort Point Road, Galveston, TX 77550

Release no. 23-008